Day Three
With the elevator fitted the next job was the control mechanism.
I had to make the bellcrank from some spare plastic. The leadout wires are from some fishing tackle with little clips on the end.
The leadout guide was made from some spare plywood and epoxied into a slot in the foam wing.
Next job – painting.







Leave a comment