Plumbing started

Plumbing with PER pipe and nouriceI finally got around to starting the plumbing.

Actually this contraption, that looks like the control deck of a submarine, is the 'nerve center' of my plastic plumbing system. I hope I'm using the French equivalent of top quality barrier pipe :-) Steve ?

From now on new runs are going to be dead easy as I just attach the length of pipe to the manifold and run the other end to the appliance, turn on the valve and voila, water. Yep, that thing is now full of water at 5 bar.

The reason there are more cold feeds than hot are because of toilets, dishwasher and washing machine. Also the strange brass things at the end of each manifold is an anti-knock device to prevent water hammer. Not sure it's really needed, but why not.

2 thoughts on “Plumbing started

  1. Hi there, I like the look of your plumbing system, I have to re plumb bathroom & kitchen etc. looked in the DIY stores for similar products but as yet have not found anything (central Finistere dept.29) wondered if you could advise where you sourced your manifold/barrier pipe etc.

    kind regards

    Henry

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>