Cloakroom and toilet painted

The downstairs cloakroom and toilet have been painted with the sink fitted and the splashback tiled. I've also fitted the ceiling lights and insulated above the two rooms as well as fitting the ducting for the VMC (ventalation/extractor system). All the necessary lighting cables have been fitted for the kitchen halogen lights and the suspended ceiling above the kitchen also insulated with it's own VMC fitted.

Quite a few 'behind the scenes' jobs complete and everything is really coming together downstairs now.

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>